Senator Johnston asked the Minister representing the Minister for Defence Materiel, upon notice, on 19 December 2012: With reference to questions on notice nos 1634 to 1683, dated 5 March 2012, and questions on notice nos 2570 to 2619, dated 26 November 2012, and given that this is the third occasion on which this information has been sought: (1) Can full and detailed information be provided, including: (a) the date of the first date for first pass approval; (b) the date of the first estimated date, time period, for second pass approval; (c) the date of first pass approval; (d) the date of second pass approval; (e) the estimated acquisition cost when first proposed to Government; (f) the current estimated acquisition cost; (g) the date of estimated initial operational capability when first proposed to Government; (h) the current date of estimated initial operational capability; and (i) the reason(s) for the delay in this project, if applicable; in relation to each of the following major projects: Tactical Information Exchange Domain JP 2089; Active Missile Decoy SEA 1229 Phase 1, 2 and 3; Anzac Ships SEA 1348 Phase 2; Anzac Ship Project-Underwater and Surface War Fighting Upgrade Program-SEA 1348 Phase 3; Guided Missile Frigate Upgrade Implementation SEA 1390 Phase 2.1; Standard Missile Replacement SEA 1390 Phase 4; Nulka SEA 1397; Forward Looking Infra Red and Electronic Support Measures for S-70B-2 Helicopters SEA 1405; Evolved SEASPARROW SEA 1428; Replacement Heavyweight Torpedo SEA 1429; COLLINS Class Replacement Combat System SEA 1439 Phase 4A; Maritime Communications Modernisation SEA 1442; Armidale Class Patrol Boat Project SEA 1444; ANZAC Anti-Ship Missile Defence SEA 1448; Replacement of Afloat Support Capability SEA 1654; Air Warfare Destroyer SEA 4000; Airborne Early Warning and Control Aircraft AIR 5077; New Air Defence Command and Control Systems for Control Units 2 and 3 AIR 5333; Bridging Air Combat Capability AIR 5349 Phase 2; Bridging Air Combat Capability AIR 5349 Phase 1; F/A-18 Hornet Upgrade AIR 5376; Air to Air Refuelling Capability AIR 5402; Project Echidna Electronic Warfare Self Protection for ADF Aircraft AIR 5416; Follow-on Stand off Weapon AIR 5418; Joint Strike Fighter Aircraft AIR 6000; Air 7000: Phases 1B and 2B AIR 7000; C-17 Globemaster III AIR 8000; Armed Reconnaissance Helicopter AIR 87; Multi Role Helicopter AIR 9000 Phase 2; MH-60R Seahawk Romeo AIR 9000 Phase 8; Airborne Surveillance for Land Operations JP 129; Establishment of Special Operations Command JP 199; Next Generation Satellite Communications System JP 2008 Phase 4; Ultra High Frequency Satellite Communications JP 2008 Phase 5A; ADF SATCOM Capability Terrestrial Upgrade JP 2008 Phase 3F; Jindalee Operational Radar Network JP 2025; Joint Command Support Environment JP 2030 Phase 8; High Frequency Modernisation JP 2043; Amphibious Watercraft Replacement JP 2048 Phase 3; Amphibious Deployment and Sustainment JP 2048 Phase 4 A/B; Bulk Liquid Distribution JP 2059; Geospatial Information Infrastructure and Services JP 2064 Phase 2; Lightweight Torpedo Replacement Phase 3 JP 2070; Lightweight Torpedo Replacement Phase 2 JP 2070; Battlespace Communications Systems (LAND) JP 2072; Logistics for the Warfighter JP 2077; ADF Deployable Logistics Systems JP 2077 Phase 2B.2; Mulwala Redevelopment Project JP 2086; Air Defence Target System JP 66 Phase 1; and Establishment of Tactical Assault Group (East) JP 2088 Phase 1. (2) Can a full and private briefing on these major projects be provided as a matter of urgency.